Federal Bureau of Prisons

Project Description
  • MEP and Fire Protection Systems Design for the Office Suites, Computer Rooms, Mail Room, Fitness Center and Command Center, Etc.
  • MEP services for the remodeling of 2nd floor at 500 First St. Building for the relocation of Property and Construction Branch
  • ADA evaluation of 3 toilets on first floor of HOLC Building, Washington DC
  • MEP services for the relocation of HOLC cafeteria from the 10th floor to the 1st floor.
  • Overview of Central Office Buildings, Washington D.C.
  • MEP services for the renovation of the 10th floor corridor of the HOLC Building.
  • MEP services for the renovation of the 9th floor of the HOLC Building.
  • Construction Administration for the renovation and addition to room 370.
  • Demolition and Historic Preservation of 9th floor.
  • Revision of construction documents of Personnel Office, suite 150 & 161 at 320 First St. Washington DC.
  • Removal and replacement of sidewalk outside the HOLC Building.
  • Renovation of sprinkler system
  • Renovation of 5th and 6th floor corridors of HOLC Building.
  • MEP services required for the renovation of the 7th floor of the HOLC Building.
  • Renovation of computer room of Trust Fund Central Office Facility @ 500 First St., Washington D.C.
  • Upgrade of Energy Management Systems
  • Design of Emergency Power Systems for Computer Rooms and Command Center.