Smithsonian Institutions

Project Description
  • Replacement of medium voltage switchgears and transformers at National Zoo, Washington DC
  • Renovation of the Visitor Center of the National Zoo, and design of an emergency power system for the critical loads
  • The Veterinarian Hospital Complex, CRC, Front Royal, VA is a multiple building complex, which required emergency power back-up at the following five facilities:
    • Veterinarian Hospital Building
    • Research Building
    • Marmoset Building
    • Necropsy Building
    • Quarantine Building
  • A/E renovation of the Hirshhorn Museum, Washington, DC
  • Fire Alarm Improvement in Building 34, 28, 26, 19, 31, 7, 20, 23, 32, 17, 21 and 22 , and Surge Protection Installation of entire Paul Garber Facility, Suitland, MD
  • Smithsonian Castle – Sewage Pit Architectural &Multi-discipline Engineering Services
  • Smithsonian National Air & Space Museum – NASM Gallery, 6th & Independence Ave., SW, Washington DC
  • National Postal Museum Exhibit Renovation, Washington DC
  • National Air & Space Museum, Improve Guard Booth Security Lighting, Washington DC
  • National Postal Museum, Replace AHU-1, Washington DC