Federal Bureau of Prisons
Project Description
- MEP and Fire Protection Systems Design for the Office Suites, Computer Rooms, Mail Room, Fitness Center and Command Center, Etc.
- MEP services for the remodeling of 2nd floor at 500 First St. Building for the relocation of Property and Construction Branch
- ADA evaluation of 3 toilets on first floor of HOLC Building, Washington DC
- MEP services for the relocation of HOLC cafeteria from the 10th floor to the 1st floor.
- Overview of Central Office Buildings, Washington D.C.
- MEP services for the renovation of the 10th floor corridor of the HOLC Building.
- MEP services for the renovation of the 9th floor of the HOLC Building.
- Construction Administration for the renovation and addition to room 370.
- Demolition and Historic Preservation of 9th floor.
- Revision of construction documents of Personnel Office, suite 150 & 161 at 320 First St. Washington DC.
- Removal and replacement of sidewalk outside the HOLC Building.
- Renovation of sprinkler system
- Renovation of 5th and 6th floor corridors of HOLC Building.
- MEP services required for the renovation of the 7th floor of the HOLC Building.
- Renovation of computer room of Trust Fund Central Office Facility @ 500 First St., Washington D.C.
- Upgrade of Energy Management Systems
- Design of Emergency Power Systems for Computer Rooms and Command Center.
Project Details
TagsFederal Government
Comments are closed.